Water treatment plant built by Darcarion
Case studies

Plants we designed, built and handed over

Selected reference projects in semiconductor and specialty glass manufacturing — ultrapure water, DI distribution, effluent treatment, and the civil works that carry them.

Design, build and commission Ultrapure water Effluent treatment General contracting
Service contract and O&M

The plant that serves an entire industrial park

Some plants we build. Others we are brought in to run. Darcarion operates the common effluent plant serving an electroplating park in Selangor — a facility we did not design, handling waste streams that leave no room for error.

The common wastewater treatment plant at Bukit Kemuning Electroplating Park
OPERATIONS CONTRACT BI-PMB Waste Management · Bukit Kemuning, Selangor

Contract operation of a common wastewater treatment plant

Commissioned in 1998 and the first facility of its kind in Malaysia, the plant treats toxic effluent from an entire electroplating park. Rinse water arrives by gravity pipeline, concentrated solution waste by forklift in mobile containers, and chrome, cyanide, acid and alkali streams stay segregated from the shop floor all the way to treatment. We run it day to day.

  • Day-to-day operation of a common effluent plant
  • Segregated chrome, cyanide, acid and alkali conveyance
  • Continuous flow treatment for rinse wastewater
  • Batch treatment for electroplating solution waste
  • Neutralisation, precipitation and clarification
  • Sludge thickening and filter press dewatering
  • Final discharge to DOE Standard B
Service contract and O&MHeavy metalsCyanide and chromeDOE Standard B
Reference projects

Designed, built and commissioned by us

Ultrapure water at semiconductor grade, high-purity distribution, effluent treatment to discharge standard, and the structural infrastructure underneath it.

Reverse osmosis skid with membrane pressure vessels
CASE 01 Semiconductor wafer fabrication

Ultrapure water pretreatment upgrade

An existing ultrapure water train needed more capacity to support additional production lines. We upgraded the pretreatment end to end and extended the distribution loop into the new areas of the fab.

  • Multimedia and activated carbon filtration
  • Strong acid and strong base ion exchange
  • Reverse osmosis for UPW pretreatment capacity
  • UPW loop piping to new production lines
  • Control panel design, build and system tie-in
  • Testing and commissioning
Design and buildUPW pretreatmentLive plant tie-in
Wastewater transfer pump skids
CASE 02 Semiconductor manufacturing

RODI, hot DI and wastewater packages

Three packages delivered together: ultrapure supply at two resistivity grades, a hot DI circuit, and the drain and collection systems that carry production effluent away.

  • 10 MΩ and 2 MΩ DI water distribution piping
  • Hot DI water piping system
  • Production drain and collection systems
  • Double containment transfer piping
  • Wastewater transfer pump systems
  • Testing and commissioning
Utilities pipingDouble containmentHot DI
RODI skid with membrane housings and stainless pipework
CASE 03 Specialty glass manufacturing

Design and build RODI plant

A complete RODI plant for a new production line — from raw water intake through to the supply and return piping at the point of use, with SCADA control across the whole train.

  • New RODI plant, design and build
  • Production supply and return piping
  • PLC SCADA automation for plant operation
  • Testing and commissioning
TurnkeyRODIPLC SCADA
Industrial effluent treatment plant under canopy
CASE 04 Specialty glass manufacturing

Industrial effluent treatment system

A 30 cubic metre per hour effluent treatment plant designed, built and automated in-house — sized for the site's discharge load and operated from a single SCADA interface.

  • 30 m³/hr IETS, design and build
  • Equalisation and process tankage
  • PLC SCADA automation for plant operation
  • Testing and commissioning
IETS30 m³/hrDischarge compliance
Leaching wastewater collection building and tankage
CASE 05 Semiconductor manufacturing

Leaching infrastructure and RODI upgrade

New collection infrastructure for leaching wastewater, including the civil and structural works to carry it — piling, slab, columns and steel — alongside an upgrade to the existing RODI plant.

  • Holding tanks for leaching wastewater collection
  • Double containment transfer piping system
  • Piling, reinforced concrete slab and columns
  • Structural steel works
  • PLC SCADA automation for plant operation
  • Testing and commissioning
Civil and structuralScheduled waste containmentDeionised waterSCADA

Tell us what you need to treat

Send us the source, the target specification and the flow. Our engineers will come back with an approach — and a treatability test if the chemistry warrants one.